Quantcast
Channel: Poor Sap Publishing
Viewing all articles
Browse latest Browse all 132

How to Where to Ask for A Building Permit

$
0
0

Are you looking for a reliable scaffolding company? You are at the right place because scafom has everything you need for your project to work perfectly. If you are planning to build a house or a commercial object it is important to note that you will need a building permit for that. But there are some buildings that do not require a building permit. Here are some of them:

– Measuring stations to protect the environment,

– Temporary buildings intended for research activities (buildings for conducting research measurements, natural resources, measuring stations for wind, sun, air, drilling, excavation, etc.) when there is a decision of the competent authority, for a period of up to three years and after the expiration of that period it should be removed,

– Buildings for signaling in air traffic

– Monuments, memorials and sculptures,

– Structures that enable and facilitate the movement of persons with disabilities,

– Telecommunication equipment for internal voice transmission and image equipment aimed at protecting the building from theft, that provide protection and rescue,

– Fences,

– Communication electronic equipment for image transmission, voice and other data that sets of objects,

– Retaining walls,

– Auxiliary constructions for housing or other objects,

– Pool field for individual use,

– Optical cables,

– Equipment for automatic regulation of passage through the existing railway lines and installations for automatic tracking and traffic management of existing railway lines,

– Electronic communication equipment for monitoring and regulating the traffic on existing roads and informative panels that are placed on buildings,

– Temporary buildings for the needs of the Directorate for Technological Industrial Development Zones which are built within the technological industrial development zones,

– Indoor and outdoor playgrounds,

– Sports halls with developed in an area of 1500 m2,

– Metering and distribution cabinets for electricity and low voltage cables,

– Electronic information and billboards (with area of 30 m2 and structural elements) that are placed in public areas,

– Beaches with accompanying facilities built on land and water surfaces,

– Hiking trails,

– Underground wells linear systems,

For tomb monuments and graves within the cemetery determined by the urban plan are built in accordance with the Law on cemeteries and funeral services.

To carry the buildings or installation of the equipment the developer submits an application to perform or setup necessary documentation to the municipality in the city, in which area should be the construction be performed, or to install the equipment and the decision issued by the Mayor of the city.

If the competent authority has taken a decision to carry out the construction or installation of equipment or not issue a decision rejecting the application within the deadline, the investor may submit a request to the mayor, or to the minister heading the state administration responsible for the affairs of spatial arrangement. It is always important to respect the decisions of the authorities and not to do anything against the law.


Viewing all articles
Browse latest Browse all 132

Trending Articles